Over-allocation surfaced before you commit. Overcharges recovered after you're billed.
A fiber route can be physically buildable and still blow its budget. Pole attachment fees, make-ready surprises, permitting delays, ROW problems, contractor change orders, and design changes surface after money is committed.
The over-allocation gets discovered after the budget is spent.
We surface line-level per-project budget over-allocation risk before money is committed: across POs, contracts, scheduled labor, and materials.
Most systems only show what was invoiced — the part you can no longer change.
OSP managers, fiber operations, network engineering, make-ready / pole attachment / ROW coordinators, project controls, and the finance teams that own project budgets.
The owner side is served: engineering firms audit the poles, write the estimates, and hold the work orders. But the records that prove what actually happened never reach the attacher. We asked why, and whether the gap could be bridged.
20 minutes with whoever owns fiber project budgets. We'll walk the method on a worked example, the same exhibit a pilot produces, and show exactly what we'd need from your records.